The short answer: split the job
If you're an office administrator who's just been handed a purchase req for a FARO portable CMM, an ultrasonic level transmitter, or any other piece of kit with a spec sheet longer than your email signature, here's the one thing I'd tell you: don't try to become the technical expert. Your job is to run a process that makes sure the right person gets asked the right question. Engineering or quality owns the "which one." You own the "from whom, at what price, and with what paperwork."
I've managed about $180,000 in measurement equipment and lab supply orders since taking over purchasing in 2021. Two of those orders went sideways because I tried to make a technical call that wasn't mine to make. This post is about what I changed after that.
Why you should take my word for it (and where I stop)
I'm the office administrator for a 400-person manufacturing company. I process 60–80 orders a year across roughly a dozen vendors — everything from FARO metrology gear to centrifuge tubes for the lab to replacement parts for the floor. I report to both operations and finance, which means I hear about it from both sides when something goes wrong.
I'm not a metrologist, so I can't tell you whether a FARO ScanArm beats a laser tracker for your specific tolerance requirements. That's a conversation for your quality engineer, and honestly, I'd be guessing. What I can tell you is how to structure the purchase so that conversation happens before the PO goes out, not after the equipment arrives and nobody knows how to use it.
How the FARO order actually went
The first FARO portable CMM request landed on my desk in early 2022. The engineering lead sent me an email with a model number and the line "please order." No specs, no justification, no acceptance criteria. I almost placed it as-is.
Here's what stopped me: I called the vendor's sales rep and asked a simple question — "what happens after we pay?" The answer was a 45-minute call about calibration schedules, software licensing, and training. That's when it clicked. The equipment price was maybe 60% of the total cost. The rest was the FARO app and software seats, the annual calibration contract, and the two-day onsite training that nobody had budgeted for.
So I went back to engineering with three questions:
- What are we measuring, and to what tolerance?
- Who's getting trained, and when?
- What's the acceptance test when it arrives?
The acceptance test question turned out to be the important one. Our quality team pointed me to ISO 10360, the standard for CMM acceptance and reverification testing. I'm not going to pretend I understand the math behind it, but I understood enough to ask the vendor: "Will you deliver with a certificate that references the applicable ISO 10360 test, and who pays if it fails?" That single question changed the contract terms.
I won't quote the final price because our configuration won't match yours. What I will say is that it was a budget line that needed finance sign-off, and the total cost — with calibration, training, and three years of support — came out roughly 40% higher than the number on the initial quote. If I hadn't asked, that 40% would have hit us as surprise spend in year two.
The costs that aren't on the quote
This is the part I wish someone had told me upfront. When you buy a FARO portable CMM, or almost any precision instrument, the purchase price is the beginning of the conversation, not the end of it.
Calibration is recurring. For our arm, that's an annual factory calibration — it's not optional if the measurements have to pass an audit or a customer quality review. The cost is usually somewhere in the low-to-mid four figures annually, depending on the service tier. I'm not going to hand you a precise number because I don't want you budgeting off a figure from a blog post. Call the vendor and get it in writing.
Software is more often than not a subscription now. FARO's app ecosystem, like most metrology software, has shifted toward annual licensing. That's a line item that renews whether you use it or not, and it needs to sit in your opex budget, not just your capex approval.
Training gets underestimated every single time. The vendor will train the people you send. They won't train the person who covers for those people when they're on vacation, and they won't retrain anyone after a staff change. I learned this the hard way when our primary CMM operator left in 2023 and we had three months of "who knows how to run this thing" before we paid for a second training session.
The small stuff that still lands on your desk
Not every measurement request is a five-figure capital purchase. On any given week I'm also ordering centrifuge tubes for the lab (we go through about 2,000 a quarter, so I keep a reorder trigger in the system), and handling the odd internal ticket like the one someone in receiving raised last month: how do I turn off the Mitutoyo digital micrometer?
That last one, honestly, I had to look up. The answer is usually in the manual, but our manual was in a drawer somewhere. What I did instead was build a shared folder with one-page "how to turn off / how to zero / how to change the battery" guides for every battery-powered instrument on the floor. Took an afternoon. It's saved me probably a dozen emails a month since.
The ultrasonic level transmitter was a different flavor of headache. That one was a process gap, not a knowledge gap. We didn't have a formal spec-review step for process instruments, and the first transmitter we ordered didn't match the tank's operating pressure range. The vendor took it back, but the restocking fee was $400 and the project slipped three weeks. After that I added a mandatory "engineering sign-off on datasheet" field to the requisition form. Should have done it after the first time.
When this split-job model doesn't work
Here's where I'll be honest about the limits of my advice. If your company doesn't have an in-house engineer or quality lead who can own the technical side of the purchase, this model falls apart. Somebody has to be the expert, and if that somebody is you, lean heavily on the vendor's application engineers and a third-party consultant before you sign anything. I've watched a smaller company buy a portable CMM without that support and end up with a system that sat in a corner because nobody was trained beyond turning it on.
The other case where I'd push back: if the equipment is going to be used for regulatory compliance or customer-facing quality certificates, don't let an admin — me included — touch the acceptance criteria. That belongs to whoever signs the quality documents. My job is to make sure the paperwork exists, the calibration schedule is on the calendar, and the invoice matches the PO. That's it.
Beyond that? The process is boring on purpose. Ask the three questions, get the recurring costs in writing, and build the reorder trigger before you need it. The boring version is the one that doesn't get you called into the VP's office.